1 / 3Project information
| Project | Krong No Hydropower Plant |
|---|---|
| Category | SCADA/DCS/OCC solutions |
| Location | Lâm Đồng |
| Client | Phuc Long Electrical Technology and Engineering Joint Stock Company |
| Year | 2025 |
| Configuration and testing services for the SCADA system at Krong No 2 and Krong No 3 hydropower plants using the IEC104 protocol. | |